Ferrovial Agroman conducts a detailed risk assessment at all sites and implements suitable preventive measures. We provide the resources needed for each situation and make sure that our Occupational Risk Management System is properly followed.

The ongoing improvement brought about by this process has led to our achieving a lower accident rate than the construction industry average.

Frequency rate

Graphic info

Frecuency rate:

  • 2004: 55.19
  • 2005: 54.03
  • 2006: 47.61
  • 2007: 46.52
  • 2008: 39.53
  • 2009: 29.35
  • 2010: 21.89
  • Sector: 52.3
Severity Index

Graphic info

Severity rate:

  • 2004: 1.08
  • 2005: 0.94
  • 2006: 0.87
  • 2007: 0.76
  • 2008: 0.65
  • 2009: 0.57
  • 2010: 0.54
  • Sector: 1.6