Quality and Environment

(Ferrovial) Construction

Content zone

1. Waste minimization: For the period between 2005 and 2012 there is an objetive to reduce the volume of construction waste sent to landfill by 56 million cubic meters. 2. Restoration of the site: Part of our objetives are based on the proposal of technical improvements the project, such as the use of existing roads and tracks as routes to the site, in order to avoid opening new acces routes, replanting with species of low water consumption and native species. 3. Topsoil: Proper management of topsoil from its extraction during excavation until its final application, is a key factor for successful restoration because this material is an autochthonous seed bank and substrate that will guarantee the stability of enbankments and sloping surface.