{"id":13274,"date":"2016-03-15T15:47:53","date_gmt":"2016-03-15T14:47:53","guid":{"rendered":"https:\/\/www.ferrovial.com\/blog\/es\/?p=13274"},"modified":"2025-12-12T11:52:49","modified_gmt":"2025-12-12T10:52:49","slug":"ports-in-the-offshore-wind-energy-sector","status":"publish","type":"post","link":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/","title":{"rendered":"The Role of Ports in the Offshore Wind Energy Sector"},"content":{"rendered":"<p>Since the construction of the first <strong>offshore wind farm<\/strong> (i.e. a wind farm in the sea at some distance from the coast) off the coast of Denmark in 1991, the <strong>offshore wind energy sector<\/strong> has grown enormously \u2013 driven mainly by northern European countries, and particularly the UK, Germany and Denmark \u2013 to become an important source of energy in today\u2019s world, with <strong>undeniable potential<\/strong> for the future.<\/p>\n<p>Up until the first half of 2015, 3,072 turbines had been connected to the European network, totalling 10.4 GW of installed capacity, thanks to the construction of 82 wind farms in 11 countries. A further 15 wind farms are currently being built, which will add 1.9 GW to the network. Although various factors have reduced the projected 40 GW of capacity which was to have been installed by 2020, annual investment in the sector, estimated at over 10 billion euros, nevertheless represents a volume such that it has become a <strong>strategic and priority business<\/strong> for large European companies, <a title=\"Ferrovial Agroman\" href=\"https:\/\/www.ferrovial.com\/en\/business-lines\/construction\/about-ferrovial-agroman\/\" target=\"_blank\" rel=\"dofollow\">Ferrovial-Agroman<\/a> amongst them.<\/p>\n<p>To achieve the targets set by the industry, <strong>European ports have a critical role to play<\/strong> within the supply chain. Depending on the installation strategy adopted, the port may be used as a base for assembly, handling and\/or manufacture, but it will in all cases act as the supply chain hub, through which all components, structures and turbines making up the wind farm must pass. This means that the first step in the construction of a wind farm must be the <strong>selection of one or more base ports<\/strong> and, if necessary, the adaptation thereof as per the requirements of each particular project.<br \/>\nOver the life cycle of a wind farm project, the phases of manufacture, preinstallation, installation, commissioning, operation and maintenance, and eventually decommissioning, will in all cases require one or several port terminals with specific facilities for the different construction phases. The main companies in the supply chain will set up an operating base in the port, and the <strong>port terminal<\/strong> will thus become a <strong>hub for first tier logistics<\/strong>, and as such a key factor in the smooth running of the project.<\/p>\n<p><strong>The port is therefore of critical strategic value<\/strong> for all stakeholders.<\/p>\n<p>The <strong><u>installation strategy<\/u><\/strong> used by the project developer will have a direct impact on the properties and facilities that manufacture and assembly port terminals must have, as well as on the type of port to be used. There are currently two different approaches based on the number and types of installation and transport vessels, and the level of assembly to be carried out in the port.<\/p>\n<ul>\n<li><strong>Transiting strategy: <\/strong>Transport of components to the wind farm in installation vessels. Depending on the operations carried out in the port terminal, two methods of construction can be further differentiated: if manufacture and assembly of components is carried out in the port, or only preassembly thereof.<\/li>\n<li><strong>Feeding approach: <\/strong>Components are transported to the wind farm in transport or feeder vessels.Today, the most widely used strategy is transporting components which have been preassembled in the port.<\/li>\n<\/ul>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-13274 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/transiting-fabricacion-premontaje-en-puerto-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Transiting. Manufacture and preassembly in port.\" aria-describedby=\"gallery-1-13555\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-150x150.png 150w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-30x30.png 30w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-40x40.png 40w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-50x50.png 50w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-32x32.png 32w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-96x96.png 96w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-128x128.png 128w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160947\/Transiting-fabricacion-premontaje-en-puerto-64x64.png 64w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-13555'>\n\t\t\t\tTransiting. Manufacture and preassembly in port. Source: EWEA, BVG Associates\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/3-transiting-pre-montaje-en-puerto-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Transiting. Preassembly in port.\" aria-describedby=\"gallery-1-13557\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-150x150.png 150w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-30x30.png 30w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-40x40.png 40w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-50x50.png 50w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-32x32.png 32w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-96x96.png 96w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-128x128.png 128w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160946\/3-transiting-pre-montaje-en-puerto-64x64.png 64w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-13557'>\n\t\t\t\tTransiting. Preassembly in port. \nSource: EWEA, BVG Associates\n\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/4-feeding-montaje-off-shore-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Feeding. Offshore assembly.\" aria-describedby=\"gallery-1-13553\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-150x150.png 150w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-30x30.png 30w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-40x40.png 40w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-50x50.png 50w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-64x64.png 64w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-128x128.png 128w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-96x96.png 96w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13160948\/4-feeding-montaje-off-shore-32x32.png 32w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-13553'>\n\t\t\t\tFeeding. Offshore assembly.\nSource: EWEA, BVG Associates\n\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/>\n\t\t<\/div>\n\n<p>The <strong><u>type of port terminal<\/u><\/strong> to be used by the offshore wind sector depends, first and foremost, on the phase of the project for which they will be used: whether for the installation phase, or for operation and maintenance of the wind farm.<\/p>\n<p>Ports used during preinstallation and installation of a wind farm must have <strong>major components and facilities<\/strong>, and depending on the installation strategy to be used, can be of the following types:<\/p>\n<ul>\n<li><strong>Import\/export ports: <\/strong>Ports receiving components from onshore manufacturers. Components are handled and stored for subsequent loading onto vessels which will transport them to manufacturing and assembly ports.<\/li>\n<\/ul>\n<div id=\"attachment_13561\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160946\/futura-terminal-puerto-humber-able-marine-energy-park.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-13561\" class=\"wp-image-13561\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160946\/futura-terminal-puerto-humber-able-marine-energy-park.jpg\" alt=\"Future terminal at Humber port.  Source: Able Marine Energy Park. Infograph\" width=\"550\" height=\"306\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160946\/futura-terminal-puerto-humber-able-marine-energy-park.jpg 797w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160946\/futura-terminal-puerto-humber-able-marine-energy-park-300x167.jpg 300w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160946\/futura-terminal-puerto-humber-able-marine-energy-park-768x428.jpg 768w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-13561\" class=\"wp-caption-text\">Future terminal at Humber port.<br \/> Source: Able Marine Energy Park. Infograph<\/p><\/div>\n<ul>\n<li><strong>Manufacturing ports: <\/strong>Due to the ever larger size and weight of wind turbine components, road transportation is becoming less viable, and turbine and foundation manufacturers are increasingly establishing manufacturing facilities in suitable ports. This follows the example of cable manufacturers, where production at ports has been well established since the beginning of the offshore cable industry.<\/li>\n<\/ul>\n<ul>\n<li><strong>Assembly ports:\u00a0<\/strong>Preassembly of components received from manufacturing plants takes place here. Components are received either by road transport or, increasingly, by sea.<\/li>\n<\/ul>\n<p style=\"padding-left: 30px;\">The use of the same port terminal for manufacturing and assembling wind turbines and nacelles will depend on the savings to be made by the project through optimisation of the supply chain.<\/p>\n<div id=\"attachment_13563\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160945\/Ejemplo-de-puerto-de-montaje.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-13563\" class=\"wp-image-13563\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160945\/Ejemplo-de-puerto-de-montaje.jpg\" alt=\" Assembly port\" width=\"550\" height=\"367\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160945\/Ejemplo-de-puerto-de-montaje.jpg 960w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160945\/Ejemplo-de-puerto-de-montaje-300x200.jpg 300w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160945\/Ejemplo-de-puerto-de-montaje-768x512.jpg 768w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/03\/13160945\/Ejemplo-de-puerto-de-montaje-800x533.jpg 800w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-13563\" class=\"wp-caption-text\">Assembly port<\/p><\/div>\n<ul>\n<li><strong>Mobilising port:<\/strong> These are ports receiving turbine components and foundation units which have already been preassembled to a degree that allows them to be loaded onto vessels for transport to the offshore wind farm where they will be installed. No manufacturing, assembly or storage takes place; they are simply ports which provide support for construction of the farms.<\/li>\n<\/ul>\n<ul>\n<li><strong>Offshore ports:\u00a0 <\/strong>This is a new concept which is still at study stage. These ports would be multipurpose offshore terminals, allowing a reduction in installation and transport costs, as well as a drop in response times for wind farm maintenance.<\/li>\n<\/ul>\n<p>The type of port used will depend on the installation strategy adopted, a cost analysis, the distance from the manufacturing centres to the wind farm, the distance from the coast to the wind farm, and future developments in the area.<\/p>\n<p>After commissioning of the wind farm, an operating base within a port is also required, but with different and less exacting requirements:<\/p>\n<ul>\n<li><strong>Operation and maintenance ports:\u00a0<\/strong>These ports provide the wind farm with support services for operation and maintenance. They must support a rapid response for contingencies in operation, and so must be located at a relatively short distance from the farm to reduce travel times for staff and parts, and optimise offshore on-site working times. These ports require no large-scale installations or specific properties.<\/li>\n<\/ul>\n<p>The port is of critical strategic value for all stakeholders, and thus selection of the most appropriate port is key to the smooth running of the wind project.<\/p>\n<p>&nbsp;<\/p>\n<p><em>An article by C\u00e9sar Enamorado<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since the construction of the first offshore wind farm (i.e. a wind farm in the sea at some distance from the coast) off the coast of Denmark in 1991, the offshore wind energy sector has grown enormously \u2013 driven mainly by northern European countries, and particularly the UK, Germany and Denmark \u2013 to become an [&hellip;]<\/p>\n","protected":false},"featured_media":13282,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"_acf_changed":false,"footnotes":""},"nivel-1":[4654],"nivel-2":[4719,4708,4718,4754,4773],"nivel-3":[],"nivel-4":[],"nivel-5":[6248],"topic":[7296,7297,7295],"coauthors":[2736],"class_list":["post-13274","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","post_format-post-format-image","nivel-1-construction","nivel-2-alternative-energy","nivel-2-distribution","nivel-2-energy","nivel-2-logistics","nivel-2-wind-farm","nivel-5-ferrovial-construction","topic-construction-and-infrastructure","topic-energy","topic-transportation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Role of Ports in the Offshore Wind Energy Sector - Ferrovial&#039;s blog<\/title>\n<meta name=\"description\" content=\"Since the construction of the first offshore wind farm in 1991 the offshore wind energy sector has grown vastly and is now an important source of energy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Role of Ports in the Offshore Wind Energy Sector - Ferrovial&#039;s blog\" \/>\n<meta property=\"og:description\" content=\"Since the construction of the first offshore wind farm in 1991 the offshore wind energy sector has grown vastly and is now an important source of energy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:published_time\" content=\"2016-03-15T14:47:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-12T10:52:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13161029\/ejemplo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"640\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ferrovial_es\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial_es\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"C\u00e9sar Enamorado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Role of Ports in the Offshore Wind Energy Sector - Ferrovial's blog","description":"Since the construction of the first offshore wind farm in 1991 the offshore wind energy sector has grown vastly and is now an important source of energy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/","og_locale":"en_US","og_type":"article","og_title":"The Role of Ports in the Offshore Wind Energy Sector - Ferrovial's blog","og_description":"Since the construction of the first offshore wind farm in 1991 the offshore wind energy sector has grown vastly and is now an important source of energy.","og_url":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_published_time":"2016-03-15T14:47:53+00:00","article_modified_time":"2025-12-12T10:52:49+00:00","og_image":[{"width":960,"height":640,"url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13161029\/ejemplo.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_creator":"@ferrovial_es","twitter_site":"@ferrovial_es","twitter_misc":{"Written by":"C\u00e9sar Enamorado","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#article","isPartOf":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/"},"headline":"The Role of Ports in the Offshore Wind Energy Sector","datePublished":"2016-03-15T14:47:53+00:00","dateModified":"2025-12-12T10:52:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/"},"wordCount":1006,"commentCount":3,"publisher":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization"},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13161029\/ejemplo.jpg","keywords":["offshore wind energy","Wind Energy"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/","url":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/","name":"The Role of Ports in the Offshore Wind Energy Sector - Ferrovial's blog","isPartOf":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#primaryimage"},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#primaryimage"},"thumbnailUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13161029\/ejemplo.jpg","datePublished":"2016-03-15T14:47:53+00:00","dateModified":"2025-12-12T10:52:49+00:00","description":"Since the construction of the first offshore wind farm in 1991 the offshore wind energy sector has grown vastly and is now an important source of energy.","breadcrumb":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#primaryimage","url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13161029\/ejemplo.jpg","contentUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2016\/02\/13161029\/ejemplo.jpg","width":960,"height":640},{"@type":"BreadcrumbList","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2016\/03\/ports-in-the-offshore-wind-energy-sector\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ferrovial.com\/blog\/en\/"},{"@type":"ListItem","position":2,"name":"The Role of Ports in the Offshore Wind Energy Sector"}]},{"@type":"WebSite","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#website","url":"https:\/\/www.ferrovial.com\/blog\/en\/","name":"Ferrovial","description":"Aeropuertos, autopistas, construcci\u00f3n y servicios (smart cities).","publisher":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ferrovial.com\/blog\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/www.ferrovial.com\/blog\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2018\/03\/13150646\/logo-vector-ferrovial.jpg","contentUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2018\/03\/13150646\/logo-vector-ferrovial.jpg","width":525,"height":156,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial_es","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.youtube.com\/ferrovial"]},{"@type":"Person","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/person\/5ab38a776151c51d837b9e992509d074","name":"C\u00e9sar Enamorado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b61b684f1b29015eed644ca9be6fead670fd853857a1cfe11255b1e5172d46a?s=96&d=mm&r=g3655d50b29a775ca7458adb89c3eac90","url":"https:\/\/secure.gravatar.com\/avatar\/8b61b684f1b29015eed644ca9be6fead670fd853857a1cfe11255b1e5172d46a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b61b684f1b29015eed644ca9be6fead670fd853857a1cfe11255b1e5172d46a?s=96&d=mm&r=g","caption":"C\u00e9sar Enamorado"},"description":"Ingeniero de Caminos, Canales y Puertos por la Universidad Polit\u00e9cnica de Madrid y Master en Ingenier\u00eda Portuaria y Costera. En 1998 ingresa en Ferrovial, trabajando como jefe de obra durante su primer a\u00f1o de profesi\u00f3n. En 1999 se incorpora a la Direcci\u00f3n T\u00e9cnica de Ferrovial Agroman, y tras un a\u00f1o en el departamento de Estructuras de Edificaci\u00f3n, desarrolla su carrera profesional en el departamento de Presa y Obras Mar\u00edtimas. En 2010 asume la responsabilidad de dirigir el departamento y desde enero de 2016 es el Jefe del \u00c1rea de Obras Hidr\u00e1ulicas y Mar\u00edtimas. Es vocal titular del Comit\u00e9 Nacional de Grandes Presas y pertenece a la Asociaci\u00f3n T\u00e9cnica de Puertos y Costas. Es miembro de diversos comit\u00e9s t\u00e9cnicos relacionados con presas y obras mar\u00edtimas y participa de manera habitual en congresos y jornadas t\u00e9cnicas de ambas especialidades."}]}},"_links":{"self":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/13274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/comments?post=13274"}],"version-history":[{"count":1,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/13274\/revisions"}],"predecessor-version":[{"id":54406,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/13274\/revisions\/54406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/media\/13282"}],"wp:attachment":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/media?parent=13274"}],"wp:term":[{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-1?post=13274"},{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-2?post=13274"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-3?post=13274"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-4?post=13274"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-5?post=13274"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/topic?post=13274"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/coauthors?post=13274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}