{"id":47593,"date":"2023-01-23T09:45:14","date_gmt":"2023-01-23T08:45:14","guid":{"rendered":"https:\/\/www.ferrovial.com\/blog\/?p=47593"},"modified":"2025-12-11T10:02:33","modified_gmt":"2025-12-11T09:02:33","slug":"off-site-modular-and-prefabrication-construction","status":"publish","type":"post","link":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/","title":{"rendered":"Off-site, Modular and Prefabrication Construction"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Imagine you have a picnic. You make some sandwiches, some finger-foods, pack the utensils and gear up for a trek into the hills where you find the ideal spot to eat. Compare this with taking all the ingredients and tools with you to the picnic site, then make the meal there. You have to carry the chopping boards, the knives, the packaging etc and then make the food in the hills while bugs attack your, as yet, unfinished sandwiches; it might seem silly.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Now apply this logic to construction sites: Off-site, Modular and Prefab Construction are the equivalent of packing your lunch in advance.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-47588\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084053\/concrete-construction-elements-to-build-the-new-train-platforms-in-den-haag-central-station-free-photo-the-hague-by-fons-heijnsbroek-june-2012tif.jpg\" alt=\"Concrete blocks\" width=\"600\" height=\"450\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084053\/concrete-construction-elements-to-build-the-new-train-platforms-in-den-haag-central-station-free-photo-the-hague-by-fons-heijnsbroek-june-2012tif.jpg 800w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084053\/concrete-construction-elements-to-build-the-new-train-platforms-in-den-haag-central-station-free-photo-the-hague-by-fons-heijnsbroek-june-2012tif-300x225.jpg 300w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084053\/concrete-construction-elements-to-build-the-new-train-platforms-in-den-haag-central-station-free-photo-the-hague-by-fons-heijnsbroek-june-2012tif-768x576.jpg 768w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">Pros<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These new techniques are gaining popularity and it\u2019s not hard to understand why: they offer a number of benefits over traditional on-site construction, including faster completion times, lower costs, and increased safety.\u00a0<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Off-site Construction<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Off-site construction refers to any process of building structures in a location other than the final construction site. This can include using <\/span><b>prefabricated components<\/b><span style=\"font-weight: 400;\">, but it can also include using techniques such as <\/span><b>panelization<\/b><span style=\"font-weight: 400;\">, where entire sections of a building are constructed off-site and then transported and assembled at the construction site. This allows builders to take advantage of a controlled environment (in the picnic analogy, this is the equivalent of the kitchen) where quality control is easier to maintain, and the risk of weather-related delays is basically eliminated.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Additionally, it also allows for greater flexibility in terms of design and the use of <\/span><b>locally sourced materials<\/b><span style=\"font-weight: 400;\">; something prized in today\u2019s sustainability circumstances. There is the reduction in delays and sound pollution to the local homes and businesses. Anyone who has lived near a construction site knows how stressful noise pollution can be (and let\u2019s spare a thought for the workers too!).\u00a0<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-47579\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082620\/building-site-off-winslow-road-geographorguk-2325569.jpg\" alt=\"Off-site construction house\" width=\"600\" height=\"428\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082620\/building-site-off-winslow-road-geographorguk-2325569.jpg 640w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082620\/building-site-off-winslow-road-geographorguk-2325569-300x214.jpg 300w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082620\/building-site-off-winslow-road-geographorguk-2325569-271x192.jpg 271w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082620\/building-site-off-winslow-road-geographorguk-2325569-212x150.jpg 212w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<h2><span style=\"font-weight: 400;\">Modular Construction<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Modular construction is a subset of off-site construction, as it refers to the process of building structures in a factory setting (as mentioned above) using pre-fabricated components that are then transported to the construction site and assembled there. Modular construction also specifies the use of standardised components, which can help to reduce costs and speed up the construction process. Additionally modular construction can be temporary or permanent, whereas off-site is typically for permanent structures.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Because the majority of the work is done elsewhere, builders can work on multiple components at the same time, which also reduces the timeline to completion.\u00a0 Work done in a factory setting gives the advantages of economies of scale, further reducing costs.\u00a0<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Prefab Construction<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Prefabrication (\u201cprefab\u201d) construction is another branch of offsite manufacturing, where building components are made off-site and then transported to the site of installation to create a structure. In the U.S., prefabrication construction has become increasingly popular in places like Arizona and Los Angeles. This method helps reduce environmental impacts caused by construction projects, such as water-, (the aforesaid) noise-, and air-pollution.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If the difference between prefab and modular eludes you, you are not alone. Often the categories can overlap, but in general prefab is a term that denotes a <\/span><b>prefabricated building<\/b><span style=\"font-weight: 400;\"> or<\/span><b> building component<\/b><span style=\"font-weight: 400;\">, manufactured in a factory prior to assembly at a construction site. By contrast modular construction refers to something built or organised in self-contained units\u2014much like bricks or building blocks. A common example of a module or unit would be bathrooms, which are easily modularised.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Safety is also a major benefit of prefab; because the majority of the work is in a controlled environment; this reduces the risk of accidents and injuries on and off of the site.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sustainability being an ever-present issue, especially in the hotel construction industry, offsite construction has been found to cut greenhouse gas emissions and reduce waste too; these reductions allow developers to be in a better position to meet their sustainability goals and reduce some of the industry\u2019s high carbon footprint.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-47583\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082550\/chen-art-modular-housing.jpg\" alt=\"Modular house\" width=\"600\" height=\"400\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082550\/chen-art-modular-housing.jpg 720w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082550\/chen-art-modular-housing-300x200.jpg 300w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20082550\/chen-art-modular-housing-290x192.jpg 290w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">Cons<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Despite the many benefits, there are also some challenges that companies may face when implementing these techniques: One of the biggest challenges is coordinating the <\/span><b>delivery<\/b><span style=\"font-weight: 400;\"> and <\/span><b>assembly <\/b><span style=\"font-weight: 400;\">of pre-fabricated components. This can be especially challenging if the transportation and assembly teams are not properly coordinated.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Additionally, there is a risk of damage during transportation which can produce delays across the whole supply chain. Another challenge that builders may also face is the need for specialised equipment and personnel, which are needed to transport and assemble the components.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-47590\" src=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084033\/prefabconcretebuilding4986-scaled.jpg\" alt=\"Prefabricated concrete building\" width=\"450\" height=\"600\" srcset=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084033\/prefabconcretebuilding4986-scaled.jpg 1920w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084033\/prefabconcretebuilding4986-225x300.jpg 225w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084033\/prefabconcretebuilding4986-768x1024.jpg 768w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084033\/prefabconcretebuilding4986-1152x1536.jpg 1152w, https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20084033\/prefabconcretebuilding4986-1536x2048.jpg 1536w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/p>\n<p><b>Lack of flexibility<\/b><span style=\"font-weight: 400;\"> is another factor, as changes in design and plans are impossible once the project begins. This ties quite closely to the <\/span><b>lack of customisation<\/b><span style=\"font-weight: 400;\"> of the process. Particularly between regions with differing temperatures and humidities, it is difficult to find one-size-fits-all modules, as materials vary widely in their suitability.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a result of all the above, extremely detailed planning is necessary to ensure that a project goes well.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Thus, we conclude: Off-site, modular and prefab construction offer building techniques with a number of benefits over traditional methods, but are not without their niches. There will always be room for onsite building, especially in areas with specific needs that are hard for factory planning to anticipate\u2026. Much like spontaneous picnics in unusual locations. <\/span><\/p>\n<p><em>An article by Luke Roberts<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Imagine you have a picnic. You make some sandwiches, some finger-foods, pack the utensils and gear up for a trek into the hills where you find the ideal spot to eat. Compare this with taking all the ingredients and tools with you to the picnic site, then make the meal there. You have to carry [&hellip;]<\/p>\n","protected":false},"featured_media":47596,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"nivel-1":[4654],"nivel-2":[4711,7129,6012,4763],"nivel-3":[],"nivel-4":[],"nivel-5":[],"topic":[7296],"coauthors":[6710],"class_list":["post-47593","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","nivel-1-construction","nivel-2-building","nivel-2-design-and-construction","nivel-2-diseno-y-construccion","nivel-2-works","topic-construction-and-infrastructure"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Modular, prefabricated and off-site construction. Do you know them?<\/title>\n<meta name=\"description\" content=\"Modular, prefabricated and off-site construction are increasingly popular techniques, as they offer multiple advantages over on-site construction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modular, prefabricated and off-site construction. Do you know them?\" \/>\n<meta property=\"og:description\" content=\"Modular, prefabricated and off-site construction are increasingly popular techniques, as they offer multiple advantages over on-site construction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-23T08:45:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-11T09:02:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20090650\/147352981-m.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2508\" \/>\n\t<meta property=\"og:image:height\" content=\"1672\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ferrovial_es\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial_es\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Luke Roberts\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Modular, prefabricated and off-site construction. Do you know them?","description":"Modular, prefabricated and off-site construction are increasingly popular techniques, as they offer multiple advantages over on-site construction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/","og_locale":"en_US","og_type":"article","og_title":"Modular, prefabricated and off-site construction. Do you know them?","og_description":"Modular, prefabricated and off-site construction are increasingly popular techniques, as they offer multiple advantages over on-site construction.","og_url":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_published_time":"2023-01-23T08:45:14+00:00","article_modified_time":"2025-12-11T09:02:33+00:00","og_image":[{"width":2508,"height":1672,"url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20090650\/147352981-m.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_creator":"@ferrovial_es","twitter_site":"@ferrovial_es","twitter_misc":{"Written by":"Luke Roberts","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#article","isPartOf":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/"},"headline":"Off-site, Modular and Prefabrication Construction","datePublished":"2023-01-23T08:45:14+00:00","dateModified":"2025-12-11T09:02:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/"},"wordCount":861,"commentCount":0,"publisher":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization"},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20090650\/147352981-m.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/","url":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/","name":"Modular, prefabricated and off-site construction. Do you know them?","isPartOf":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#primaryimage"},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20090650\/147352981-m.jpg","datePublished":"2023-01-23T08:45:14+00:00","dateModified":"2025-12-11T09:02:33+00:00","description":"Modular, prefabricated and off-site construction are increasingly popular techniques, as they offer multiple advantages over on-site construction.","breadcrumb":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#primaryimage","url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20090650\/147352981-m.jpg","contentUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2023\/01\/20090650\/147352981-m.jpg","width":2508,"height":1672},{"@type":"BreadcrumbList","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2023\/01\/off-site-modular-and-prefabrication-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ferrovial.com\/blog\/en\/"},{"@type":"ListItem","position":2,"name":"Off-site, Modular and Prefabrication Construction"}]},{"@type":"WebSite","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#website","url":"https:\/\/www.ferrovial.com\/blog\/en\/","name":"Ferrovial","description":"Aeropuertos, autopistas, construcci\u00f3n y servicios (smart cities).","publisher":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ferrovial.com\/blog\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/www.ferrovial.com\/blog\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2018\/03\/13150646\/logo-vector-ferrovial.jpg","contentUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2018\/03\/13150646\/logo-vector-ferrovial.jpg","width":525,"height":156,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial_es","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.youtube.com\/ferrovial"]},{"@type":"Person","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/person\/cb10e8d99522a5c191993c93ce43fac6","name":"Luke Roberts","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8e973bfec3531da10d2cc2e015c585c7e0df0caf50527501ee9271ecaf842363?s=96&d=mm&r=gd2af3b1c16e7179f68824dbd66941950","url":"https:\/\/secure.gravatar.com\/avatar\/8e973bfec3531da10d2cc2e015c585c7e0df0caf50527501ee9271ecaf842363?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8e973bfec3531da10d2cc2e015c585c7e0df0caf50527501ee9271ecaf842363?s=96&d=mm&r=g","caption":"Luke Roberts"}}]}},"_links":{"self":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/47593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/comments?post=47593"}],"version-history":[{"count":4,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/47593\/revisions"}],"predecessor-version":[{"id":53383,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/47593\/revisions\/53383"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/media\/47596"}],"wp:attachment":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/media?parent=47593"}],"wp:term":[{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-1?post=47593"},{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-2?post=47593"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-3?post=47593"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-4?post=47593"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-5?post=47593"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/topic?post=47593"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/coauthors?post=47593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}