{"id":7417,"date":"2014-06-10T10:51:06","date_gmt":"2014-06-10T08:51:06","guid":{"rendered":"https:\/\/www.ferrovial.com\/blog\/?p=7417"},"modified":"2025-12-11T17:06:55","modified_gmt":"2025-12-11T16:06:55","slug":"heathrow-airports-t5-baggage-handling-system","status":"publish","type":"post","link":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/","title":{"rendered":"Heathrow Airport&#8217;s T5 baggage handling system"},"content":{"rendered":"<p>An underground city with streets, tunnels, traffic signs and security cameras ensures that our baggage arrives at its destination, safe and sound and at the same time as us. <strong>We explain the route travelled by the suitcases through the baggage handling system of <a href=\"https:\/\/www.ferrovial.com\/en-gb\/business\/projects\/heathrow-airport\/\" target=\"_blank\" rel=\"noopener noreferrer\">Heathrow Airport<\/a>\u2019s T5<\/strong>.<\/p>\n<p><iframe loading=\"lazy\" src=\"\/\/www.youtube.com\/embed\/b6OiSQ9iGa0?rel=0\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p><em>An article by Ferrovial<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An underground city with streets, tunnels, traffic signs and security cameras ensures that our baggage arrives at its destination, safe and sound and at the same time as us. We explain the route travelled by the suitcases through the baggage handling system of Heathrow Airport\u2019s T5. An article by Ferrovial<\/p>\n","protected":false},"featured_media":7394,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"nivel-1":[4660],"nivel-2":[4805,4741,4720,4743,4807],"nivel-3":[4853],"nivel-4":[],"nivel-5":[5668],"topic":[7296,7295],"coauthors":[228],"class_list":["post-7417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","nivel-1-airports","nivel-2-air-transport","nivel-2-airport-infrastructure","nivel-2-baggage","nivel-2-infrastructures","nivel-2-passenger-transport","nivel-3-uk","nivel-5-heathrow-airport","topic-construction-and-infrastructure","topic-transportation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Heathrow Airport&#039;s T5 baggage handling system - Ferrovial&#039;s blog<\/title>\n<meta name=\"description\" content=\"We explain the route travelled by the suitcases through the baggage handling system of Heathrow Airport\u2019s T5\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Heathrow Airport&#039;s T5 baggage handling system - Ferrovial&#039;s blog\" \/>\n<meta property=\"og:description\" content=\"We explain the route travelled by the suitcases through the baggage handling system of Heathrow Airport\u2019s T5\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/\" \/>\n<meta property=\"og:site_name\" content=\"Ferrovial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ferrovial\" \/>\n<meta property=\"article:published_time\" content=\"2014-06-10T08:51:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-11T16:06:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2014\/06\/13160526\/Sistema-de-equipajes.png\" \/>\n\t<meta property=\"og:image:width\" content=\"669\" \/>\n\t<meta property=\"og:image:height\" content=\"359\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ferrovial_es\" \/>\n<meta name=\"twitter:site\" content=\"@ferrovial_es\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ferrovial\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Heathrow Airport's T5 baggage handling system - Ferrovial's blog","description":"We explain the route travelled by the suitcases through the baggage handling system of Heathrow Airport\u2019s T5","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/","og_locale":"en_US","og_type":"article","og_title":"Heathrow Airport's T5 baggage handling system - Ferrovial's blog","og_description":"We explain the route travelled by the suitcases through the baggage handling system of Heathrow Airport\u2019s T5","og_url":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/","og_site_name":"Ferrovial","article_publisher":"https:\/\/www.facebook.com\/ferrovial","article_published_time":"2014-06-10T08:51:06+00:00","article_modified_time":"2025-12-11T16:06:55+00:00","og_image":[{"width":669,"height":359,"url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2014\/06\/13160526\/Sistema-de-equipajes.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_creator":"@ferrovial_es","twitter_site":"@ferrovial_es","twitter_misc":{"Written by":"Ferrovial"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#article","isPartOf":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/"},"headline":"Heathrow Airport&#8217;s T5 baggage handling system","datePublished":"2014-06-10T08:51:06+00:00","dateModified":"2025-12-11T16:06:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/"},"wordCount":58,"commentCount":0,"publisher":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization"},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#primaryimage"},"thumbnailUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2014\/06\/13160526\/Sistema-de-equipajes.png","keywords":["infraestructuras"],"articleSection":["Airports"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/","url":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/","name":"Heathrow Airport's T5 baggage handling system - Ferrovial's blog","isPartOf":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#primaryimage"},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#primaryimage"},"thumbnailUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2014\/06\/13160526\/Sistema-de-equipajes.png","datePublished":"2014-06-10T08:51:06+00:00","dateModified":"2025-12-11T16:06:55+00:00","description":"We explain the route travelled by the suitcases through the baggage handling system of Heathrow Airport\u2019s T5","breadcrumb":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#primaryimage","url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2014\/06\/13160526\/Sistema-de-equipajes.png","contentUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2014\/06\/13160526\/Sistema-de-equipajes.png","width":669,"height":359,"caption":"Sistema de equipajes"},{"@type":"BreadcrumbList","@id":"https:\/\/www.ferrovial.com\/blog\/en\/2014\/06\/heathrow-airports-t5-baggage-handling-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ferrovial.com\/blog\/en\/"},{"@type":"ListItem","position":2,"name":"Heathrow Airport&#8217;s T5 baggage handling system"}]},{"@type":"WebSite","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#website","url":"https:\/\/www.ferrovial.com\/blog\/en\/","name":"Ferrovial","description":"Aeropuertos, autopistas, construcci\u00f3n y servicios (smart cities).","publisher":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ferrovial.com\/blog\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#organization","name":"Ferrovial S.A.","url":"https:\/\/www.ferrovial.com\/blog\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/logo\/image\/","url":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2018\/03\/13150646\/logo-vector-ferrovial.jpg","contentUrl":"https:\/\/static.ferrovial.com\/wp-content\/uploads\/sites\/3\/2018\/03\/13150646\/logo-vector-ferrovial.jpg","width":525,"height":156,"caption":"Ferrovial S.A."},"image":{"@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ferrovial","https:\/\/x.com\/ferrovial_es","https:\/\/www.linkedin.com\/company\/ferrovial","https:\/\/www.youtube.com\/ferrovial"]},{"@type":"Person","@id":"https:\/\/www.ferrovial.com\/blog\/en\/#\/schema\/person\/56c3f47226b69074cc48d2bbde5b8f96","name":"Ferrovial","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/5f700ad21d2c94e5375af571bd7c4cdc1294ed836e509dd1ecf45f89672eec10?s=96&d=mm&r=ga8d3c67c022897052b37eedf08ad0a14","url":"https:\/\/secure.gravatar.com\/avatar\/5f700ad21d2c94e5375af571bd7c4cdc1294ed836e509dd1ecf45f89672eec10?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5f700ad21d2c94e5375af571bd7c4cdc1294ed836e509dd1ecf45f89672eec10?s=96&d=mm&r=g","caption":"Ferrovial"}}]}},"_links":{"self":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/7417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/comments?post=7417"}],"version-history":[{"count":2,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/7417\/revisions"}],"predecessor-version":[{"id":54575,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/posts\/7417\/revisions\/54575"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/media\/7394"}],"wp:attachment":[{"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/media?parent=7417"}],"wp:term":[{"taxonomy":"nivel-1","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-1?post=7417"},{"taxonomy":"nivel-2","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-2?post=7417"},{"taxonomy":"nivel-3","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-3?post=7417"},{"taxonomy":"nivel-4","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-4?post=7417"},{"taxonomy":"nivel-5","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/nivel-5?post=7417"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/topic?post=7417"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.ferrovial.com\/blog\/en\/wp-json\/wp\/v2\/coauthors?post=7417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}