Houston, Texas
-
23972SY
Remove concrete paving
-
23476SY
Excavation
-
142078SF
Reinforce Concrete Slab
-
6437LF
Drill Shaf
Widening of Beltway 8 North Loop West Hardy toll road to Aldine Westfield. This project added auxiliary lanes and widened bridges – IH 45 N to US 59 N.
Widening of Beltway 8 North Loop West Hardy toll road to Aldine Westfield. This project added auxiliary lanes and widened bridges – IH 45 N to US 59 N.
Major Work Items
- Remove concrete paving – 23,972 SY
- Excavation – 23,476 SY
- Reinforce Concrete Slab – 142,078 SF
- Drill Shaft – 6,437 LF
- Retaining Walls – 35,710 SF
- Rail Ty T551 – 11,915 LF
- Remove Structure Pipe – 5,088 LF
- Concrete Box Culverts – 4,218 LF
- Manholes / Inlets – 55 EA
The Scope
- Grading
- Stabilization
- Detours
- Electrical
- Signage
- Striping