Washington County, USA
-
$5.7M
Retaining Wall MSE
-
$3.89M
Concrete Paving
-
$3.85M
New Asphalt Surface
-
$2.1M
Underground
The project consisted of five miles of reconstruction of mainlane and frontage road construction from Woodward Creek Bridge to the BNSF RR Bridge in Brenham TX on US 290.
The project consisted of five miles of reconstruction of mainlane and frontage road construction from Woodward Creek Bridge to the BNSF RR Bridge in Brenham TX on US 290.
Limits:
- Start- STA: 1266+60
- End- STA: 1449+00
- Cross Streets Include: SH 36, BU 290, & FM 577
The project consisted of 12 total MSE Retaining Walls totaling 138,000 SF and 3 Soil Nail Retaining Walls totaling 12,000 SF, two new bridges, 6 existing bridge approach slab and rail replacements as well as 400,000 CY of embankment