WVJ UPRR Mesquite Automotive Facility, TX

Texas, EE.UU

Heavy civil
  • 8
    0
    1
    2
    3
    4
    5
    6
    8
    0
    2
    5
    7
    9
    2
    4
    6
    8
    1
    3
    5
    8
    0
    2
    5
    7
    9
    2
    4
    6
    9
    1
    3
    5
    8
    0
    2
    5
    7
    8
    0
    6
    1
    7
    2
    8
    3
    9
    4
    0
    5
    1
    6
    2
    7
    3
    8
    4
    9
    5
    0
    6
    1
    7
    2
    8
    3
    9
    4
    0
    6
    1
    7
    2
    8
    3
    9
    4
    0
    5
    1
    6
    2
    7
    5
    .8
    0
    6
    3
    9
    6
    2
    8
    5
    1
    8
    4
    0
    7
    3
    0
    6
    2
    9
    5
    2
    8
    4
    1
    7
    4
    0
    6
    3
    9
    6
    2
    8
    5
    1
    7
    4
    0
    7
    3
    9
    6
    2
    9
    5
    1
    8
    4
    1
    7
    3
    0
    6
    3
    9
    5
    2
    8
    5
    1
    8
    0
    1
    2
    4
    5
    6
    7
    8
    0
    1
    2
    3
    4
    6
    7
    8
    9
    0
    2
    3
    4
    5
    6
    8
    9
    0
    1
    2
    4
    5
    6
    7
    8
    0
    1
    2
    3
    4
    6
    7
    8
    9
    0
    2
    3
    4
    5
    6
    8
    9
    0
    1
    2
    4
    5
    6
    7
    8
    0
    1
    2
    3
    4
    6
    7
    8
    9
    0
    2
    3
    4
    5
    6
    2

    Cost

Asphalt removal & disposal, asphalt paving, concrete removal & disposal, concrete paving, pipe installation.

The construction contract includes the following points:

  • Pothole repair
  • 2” pothole milling, asphalt removal, concrete removal
  • Installation of 8” HDPE pipes and 4 drains
  • 2” layer of asphalt, 6” asphalt paving, 10” concrete paving