WVJ UPRR Mesquite Automotive Facility, TX

Texas, EE.UU

  • 675.115

    Cost

Asphalt removal & disposal, asphalt paving, concrete removal & disposal, concrete paving, pipe installation.

The construction contract includes the following points:

  • Pothole repair
  • 2” pothole milling, asphalt removal, concrete removal
  • Installation of 8” HDPE pipes and 4 drains
  • 2” layer of asphalt, 6” asphalt paving, 10” concrete paving