    1.3
    B

    Total Investment

  • 46
    mi

    Length

  • $
    968
    M

    Contractual Value

  • 28
    M yd³

    Earthwork

SH 130 Segments 5 and 6 (SH 130) is a large and complex four-lane, 46-mile, divided, limited access, all electronic open road toll highway constructed on a new terrain, traversing rural portions of Travis, Caldwell and Guadalupe counties in central Texas and bypassing a heavily congested stretch of IH 35.

SH 130 Segments 5 and 6 (SH 130) is a large and complex four-lane, 40-mile, divided, limited access, all electronic open road toll highway constructed on a new terrain, traversing rural portions of Travis, Caldwell and Guadalupe counties in central Texas and bypassing a heavily congested stretch of IH 35.

The project design and construction of the interim configuration (four-lane), accommodates future ultimate configuration (six-lane). The construction consisted of 72 new constructed bridges including three major interchanges; two direct connectors on I-10, four direct connectors on SH-45 (up to 100 feet high), one direct connector and one underpass at the Lockhart interchange; 28 million cubic yards of earthwork; 1.8 million tons of asphalt and intelligent transportation system installation.

SH 130 is the first greenfield DBFOM contract in Texas awarded and completed. We seve as lead member of the lead contractor responsible for design and construction under a lump-sum, fixed-price and fixed-schedule.

Our projects around the world

See more projects Expansion of the Jorge Chávez...

Expansion of the Jorge Chávez…

Discover the project
Santiago de Chile Metro's Line 6

Santiago de Chile Metro’s Line 6

Discover the project
Thames Tideway Tunnel. Tramo central

Thames Tideway Tunnel, Central Section

Discover the project
Google Play App Store